Water
The data center will drain our water.
The facility uses a sealed, closed-loop, non-evaporative cooling system filled with a propylene glycol based coolant, a far less toxic cousin of the ethylene glycol used in car radiators. The system is fully contained: the fluid never touches soil, groundwater, or surface water, and refills happen only in the event of a leak or maintenance.
The cooling loops are filled one time with approximately 619,000 gallons of fluid, made up of 464,250 gallons of water and 154,750 gallons of propylene glycol, a 25 percent glycol mixture. That fill stays in the system. It is not consumed, discharged, or replaced on a schedule.
Ongoing water use is approximately 3,800 gallons per day at peak, covering office use, restrooms, maintenance, and humidification, with humidification accounting for 2,500 gallons of that during the driest conditions. That is roughly what a dozen households use in a day. A separate 20,000 gallon reserve is held on site for fire protection.
Source: Project engineering estimate, August 6, 2026. Figures are estimates pending final piping and system design.